Follow us on:
headoffice@quadranenergi.id

PROJECT LIST

NO PROJECT'S TITTLE USER LOCATION PERIOD REMARK
1 Pararel Operation Study for PLTU Asahimas Chemical 2X151.5 MW ti PLN Subsystem Cilegon PT Asahimas Chemical Cilegon Jan' 2019 Main Consultant
2 Preliminary Electrical Study of Riau Hybrid REPP PT Poyry Indonesia Riau Dec' 2018 Main Consultant
3 Grid Impact Study Renewable Energy Hybrid Solar Pv North Sulawesi PT Poyry Indonesia Sulawesi Nov' 2018 Main Consultant
4 Grid Impact Study of Sancang Garut Wind Farm 150 MW EGERES INVESMENT Pte.Ltd Garut – Jabar Nov’18-Jan’19 Main Consultant
5 Preliminary Feasibility Study Solar Farmin Lampung EDF Energy Lampung Nov'18-Dec'18 Main Consultant
6 Grid Impact Study for A Wind Power Plant (80 MW) in Aceh – Indonesia PT. Aceh Energi Eoliana-AKUO ENERGY Aceh Nov'18-Feb'19 Main Consultant
7 Grid Impact Study NT (60 MW) in Majene – Indonesia PT. Majene Energi Bayu-AKUO ENERGY Majene Nov'18-Feb'19 Main Consultant
8 Preliminary Electrical Study of Riau Hybrid REPP (Solar PV and Diesel Engine) PT. POYRY Indonesia Riau Nov'18-Dec'18 Main Consultant
9 Grid Impact Study for Combined Cycle Power Plant in Sumatra Tractebel Engineering Jambi August'18-September'18 Main Consultant
10 Preliminary Grid Study Lawelawe -LSS Sugar Group Engie Asia Pasific Co. Ltd Lawe-lawe Kaltim Maret'18-April'18 Main Consultant
11 Grid Impact Studies for Indonesia Archipelago Hybrid Solutiong (AHS) Project Infunde Development PTE. Ltd Papua,Nias,sumba,etc March'18 - December'18 Main Consultant
12 PRELIMINARY GRID IMPACT STUDY Solar Farm PV on Mahakam System, East Kalimantan Engie Services Indonesia East Kalimantan February'18 - March'18 Main Consultant
13 Review on Grid Impact Study of Hybrid Power Plant Infunde Development PTE. Ltd Nusa Tenggara Barat January'18 - March'18 Main Consultant
14 Power System Consulting Study for 2 x 100 MW Kaltim 3 & Kaltim 6 Coal Fired Power Plant in East Kalimantan PT. POYRY Indonesia Jakarta November '17- January 2018 Main Consultant
15 Jakarta’s Network Master Plan Study PLN Pusat-Tractebel Engineering Jakarta September'17-May'18 Sub-Consultant
16 Grid Study for Solar Farm 40 MWp GE Energy Bali March'17-May'17 Sub-Consultant
17 Grid Study PLTBG Laman Satong AANE KAL Austindo Aufwind New Energy West Kalimantan January'17 - March'17 Main Consultant
18 MW Coal Fired Power Plant in East Kalimantan Tractebel Engineering East Kalimantan July'17-September'17 Sub-Consultant
19 Grid Integration Study For Solar Farm In Belitung Island Internationale Zusammenarbeit (GIZ) GmbH Belitung Island November'16-July'17 Sub-Consultant
20 Grid Code Analysis for Sumatra and Kalimantan Tractebel Engineering Sumatera & Kalimantan October'16-December'16 Sub-Consultant
21 Grid Impact Study of Solar Farm in Lampung Tractebel Engineering Lampung October'16-December'16 Sub-Consultant
22 Lasolo Hydro Power Plant Power System Study PT Lasolo Hidro Energi-Power China Lasolo, South East Sulawesi October'16-November'16 Sub-Consultant
23 Preliminary Grid Impact Study For Solar Farm In North Sulawesi GE Energy North Sulawesi August'16 - October'16 Sub-Consultant
24 Grid Impact Study For Solar Farm Tractebel Engineering Sumut, Kalsel, & Lampung June'16 - July'16 Sub-Consultant
25 Timor Regional Interconnection Study World Bank-Tractebel Engineering NTT-Timor Leste Maret’16-June'16 Sub-Consultant
26 Interconnection Study of Biogas Power Plant Gunung Pelawan Lestari Evans Group Company Bangka Maret’16-April’16 Sub-Consultant
27 Feasibility Study of Waste Crusher PT. Myeoungjin Indonesia Jabodetabek, Bandung, Serang Februari’16-Maret’16 Sub-Consultant
28 Electricity Study of PLTBg AANE Jangkang Belitung Austindo Aufwind New Energy Belitung September’15- October’15 Sub-Consultant
29 Electricity Study of PLTB Simangambat Julu Austindo Aufwind New Energy North Sumatera June’15-September’15 Sub-Consultant
30 Demand Analysis and Electricity Supply Services Star Energy Hamiding and Jailolo Maret – September 2014 Sub-Consultant
31 site Aspect- Consortium LAPI LGC-JAPC-Marubeni-IEEJ PT. PLN (Persero) Pusat Bangka April 2012 – Juli 2013 Sub-Consultant
32 Generator Parameter Identification for Stability Studies P3B Java Bali and Power Tech Canada PLN P3B Cinere November 2012 – January 2013 Sub-Consultant
33 Minimize Swing Oscilation in Java Bali Power System Hitachi Power System Japan 2013-2015 Sub-Consultant
NO PROJECT'S TITTLE USER LOCATION PERIOD REMARK
1 Studi Kelayakan Enjinering Sistem Interkoneksi 500 KV HVDC Sumatera - Jawa PT PLN Pusat Enjiniring Ketenagalistrikan Sumatera, Jawa Januari 2019 – Juli 2019 Sub-Consultant
2 Penyusunan Daftar Penyedia Terpilih (Dpt) untuk Kompenen Utama Meter Prabayar Fasa Tunggal PT PLN Kantor Pusat Jakarta Desember 2018 – April 2019 Sub-Consultant
3 Studi Kualitas Daya Listrik dan Kesiapan Sistem Sulbagsel dan Salutgo PLN P2S Sulawesi Januari 2019 – Maret 2019 Sub-Consultant
4 Pengadaan dan Pemasangan Fiohl untuk Percepatan Manuver di Keypoint PLN KALSELTENG Kalimantan Agustus 2018 – Desember 2018 Sub-Consultant
5 Jasa Konsultasi Studi Dan Uji Dinamis Untuk Proteksi Sistem PT. PLN Unit Induk Pusat Pengatur Beban Depok February 2019 - Maret 2019 Sub-Consultant
6 Belanja Jasa Konsultan Perencana Pemeliharaan Jaringan Listrik Gedung Kantor Dan Rumdin Dinas Walikota Bandung Bandung Nov ’18 – Dec ‘18 Main Consultant
7 Jasa Konsultasi Perencanaan Pekerjaan Revitalisasi Panel Tm 20 KV Dan T7 Di Gardu JATSC LPPNPI Tangerang Sept ’17- Nov ‘ 18 Sub-Consultant
8 Pembuatan Aplikasi Progres SPK SKTM Berbasis Android PT. PLN (Persero) Area Jakarta Raya Jakarta - Main Consultant
9 Rekonfigurasi Jaringan SCADA Untuk Kehandalan Jaringan RTU GI dan GH PT. PLN (Persero) Area Kalselteng Kalimantan November ’18 – December ‘18 Main Consultant
10 Jasa Pengembangan Aplikasi Pendukung Operasi Realtime UP2D Kalsel Dan Kalteng PT. PLN (Persero) Area Kalselteng Kalimantan November ’18 – January ‘19 Main Consultant
11 Pengembangan Fitur Aplikasi Mapping PT. PLN (Persero) AREA KEBON JERUK Jakarta December ’18 – January ‘19 Main Consultant
12 Studi Sistem Jawa Bali Tahun 2018 Studi Mitigasi Gangguan Sutet 500 KV Paiton Grati PT. PLN Unit Induk Pusat Pengatur Beban Depok November ’18 – March ‘19 Sub-Consultant
13 Pengoperasian Dan Pemeliharaan Instalasi Listrik Jaringan Visual Aid, UPS / Rectifier Dan Penerangan di BSH PT. Angkasa Pura Solusi Tangerang September ’18 – August ‘19 Main Consultant
14 JASA KONSULTASI STUDI DYNAMIC PEMODELAN PEMBANGKIT JAWA BALI TAHUN 2018 PT. PLN Unit Induk Pusat Pengatur Beban Depok May ’18 – November ‘18 Sub-Consultant
15 Studi Sistem Jawa Bali Tahun 2018 Jasa Pendampingan Studi Defence Scheme Jawa Bali PT. PLN Unit Induk Pusat Pengatur Beban Depok August ’18 – February ‘19 Sub-Consultant
16 Jasa Konsutan Perencanaan Pekerjaan Remot Control Monitoring System (RCMS) Terminal 3 Bandara Soekarno Hatta PT. Angkasa Pura II Tangerang August ’18 – September ‘19 Sub-Consultant
17 Studi Sistem Jawa Bali Tahun 2018 Preminilary Study HVDC Sistem Jawa Bali PT. PLN Unit Induk Pusat Pengatur Beban Depok June ’18 – August ‘18 Sub-Consultant
18 Belanja jasa konsultasi perencanaan (Evaluasi Kinerja pd. Kebersihan Kota Bandung) Pemkot Bandung Kota Bandung July ’18 – August ‘18 Main Consultant
19 Jasa Konsultan Pengawas Paket Pekerjaan Replacment Peralatan Listrik Substation P50 & Relay Proteksi Line Differential Teknik Utara Di Bandara Soekarno Hatta PT. Angkasa Pura II Tangerang September ’18 – june ‘19 Sub-Consultant
20 Supervisi Instalasi Dan Testing Commisining Pemasangan UPS, Genset & Lighting Terminal 3 Bandara Soekarno - Hatta Dan Pemasangan Pannel Bandung PT. Angkasa Pura Solusi Tangerang September ’18 – February ‘19 Main Consultant
21 Penguatan Securiy System Pada Network SCADA Dan Komunikasi VOIP PT. PLN (Persero) Wil Kalselteng dan Kalteng Kalimantan June ’18 –September ‘18 Sub-Consultant
22 Pembuatan Dan Pemasangan Aplikasi Web Portal APD Jateng Dan DIY PT. PLN (Persero) APD Jateng Dan DIY Jateng dan DIY May ’18 – August’18 Sub-Consultant
23 Jasa Konsultasi Revisi Kajian Road Map Susut Jaringan Tahun 2018 - 2020 Pln Kantor Pusat PT. PLN (Persero) Kantor Pusat Jakarta May 2018 Sub-Consultant
24 Assesment Single Line Diagram PT. PLN (Persero) PJB Bekasi February ’18 Sub-Consultant
25 Pekerjaan Ded Pembangunan Gedung Airport Learning Academy Bandara Soekarno Hatta PT. Angkasa Pura II Tangerang January’18-may’18 Sub-Consultant
26 Mapping Survey for Medium Voltage Network PLN BANTEN SELATAN Banten August'18-Nov'18 Sub-Consultant
27 Jasa Konsultansi Alternatif Model Bisnis Kerjasama Penyediaan Kapasitas Tenaga Listrik PT. PLN (Persero) Kantor Pusat Jakarta July'18-Nov'18 Sub-Consultant
28 Finansial Masuknya Pembangkit EBT (Intermittent) Pada Sistem Tenaga Listrik PT. PLN (Persero) Kantor Pusat Jakarta July'18-Nov'18 Sub-Consultant
29 Jasa Konsultan Perencana Pekerjaan Remote Control Monitoring System (RCMS) Terminal 3 Di Bandara Soekarno Hatta PT. Angkasa Pura II Tangerang August'18-October'18 Sub-Consultant
30 Kegiatan Inventarisasi Rumah Tangga Belum Berlistrik PLN di Wilayah Provinsi Jawa Barat PT. PLN (Persero) Distribusi Jawa Barat Jawa Barat May'18-September'18 Sub-Consultant
31 Studi Sistem Jawa Bali Tahun 2018 Premilinary Study HVDC Sistem Jawa Bali PT PLN (PERSERO) P2B Jakarta May'18-August'18 Sub-Consultant
32 Jasa Konsultan Manajemen Konstruksi Pekerjaan Penambahan Gardu Listrik Bandara Husein Bandung PT. Angkasa Pura II Bandung January '18-August'18 Sub-Consultant
33 Consultation Study of SCADA Transmission & Distribution Timor System PT. PLN (Persero) Wil NTT NTT September'17-December'17 Sub-Consultant
34 Pengadaan Dan Pemasangan Server Historical Dan Server Portal Aplikasi Apd Integrasi Dengan Server Scada PT PLN (PERSERO) Wilayah Kalselteng Kalselteng May'17-August'17 Main Consultant
35 Jasa Engineering (Engineering Design) Pada Proyek Replacement Peralatan Jaringan Listrik Priority dan Non-Priority Kawasan Tengah Di Bandara Soekarno-Hatta PT NINDYA KARYA (Persero) Bandara Soekarno Hatta Tangerang February'17-Februari'18 Main Consultant
36 Detail Engineering Desain (DED) Integrated Building – Bandara Soekarno Hatta PT. Angkasa Pura II Jakarta February 2017-April'17 Sub-Consultant
37 Training for High Voltage Technicians PT. Angkasa Pura II Jakarta October'17-September'17 Sub-Consultant
38 Detail Engineering Desain (DED) ME Revitalization Terminal 1 – Bandara Soekarno Hatta PT. Angkasa Pura II Jakarta March'17-November'17 Sub-Consultant
39 Measurement of Dynamic Parameters of Generators In Jawa-Bali Power System, 2017 PT. PLN (Persero) Pusat Pengatur Beban Jakarta July '17 - Februari'18 Sub-Consultant
40 Assesmen Sistem Jaringan Listrik Bandara Soekarno-Hatta PT. Angkasa Pura II Bandara Soekarno-Hatta December'16-Februari'17 Sub-Consultant
41 Replacement Peralatan Jaringan Listrik Priority Dan Non Priority Kawasan Tengah Di Bandara Soekarno Hatta PT. Angkasa Pura II Bandara Soekarno-Hatta Januari'17-Desember'17 Sub-Consultant
42 Mobile Power Plant and Fixed Type Gas Engine Power Plant Package VII PT. PP Flores NTT Maret'17-September'17 Sub-Consultant
43 Studi Sensitivitas Pengembangan Sistem Kelistrikan Jawa-Bali Tahun 2019-2022 PT. PLN (Persero) Pusat Pengatur Beban Jakarta Desember'16-Juni'17 Sub-Consultant
44 Engineering Design of 500 KV Sumatera System Enjiniring Ketenagalistrikan (Pusenlis) Jakarta August'17 - March'19 Sub-Consultant
45 Reassessment Studies of On Going Sumatera-Java 500kV HVDC Interconnection Project for Reliability & Security of Power Supply in Java & Sumatera PT. PLN Pusat (Persero) Java & Sumatera November'16 - February'17 Sub-Consultant
46 Feasibility Study of Airport Power Plant Consortium of Angkasa Pura II-Perusahaan Gas Negara-WIKA Bandara Soekarno Hatta May'16- July'16 Sub-Consultant
47 Electricity Network Assessment PT. Angkasa Pura II Bandara Soekarno Hatta Sept'16-December'16 Sub-Consultant
48 Development Study of Jawa-Bali Grid 2019-2022 PT. PLN (Pusat) Jakarta October'16-March'17 Sub-Consultant
49 Planning and Power System Supply Switchgear 6,3 kV CNG Plant PT. PLN PJB PLTGU Muara Tawar August'16 - October '16 Sub-Consultant
50 Evaluasi Kegiatan Listrik Perdesaan Tahun 2014 - 2015 Wilayah Kabupaten Dan Kota Bekasi UPT ESDM Jawa Barat Wilayah II Purwakarta Bekasi September '16-November'16 Sub-Consultant
51 Analisis Dampak Sistem Tenaga di Sumatera Utara atas Proyek IPP KEK Sei Mangkei 250 MW PT. Pertamina Persero Sumatera Utara Juni'16-Juli'16 Sub-Consultant
52 Kegiatan Penyusunan Roadmap Pengembangan Jaringan Listrik Menuju Re Jawa Barat 100% Dinas Energi Dan Sumber Daya Mineral Provinsi Jawa Barat Jawa Barat Juni'16-Agustus'16 Sub-Consultant
53 Studi Pelaksanaan Operation and Maintenance Peralatan Elektronika, Elektrikal Dan Mekanikal Di Terminal 3 Ultimate Bandar Udara Internasional Soekarno-hatta PT. Angkasa Pura II Bandara Soekarno HattaTangerang February'16-April'16 Sub-Consultant
54 Power Wheeling Implementation Study PT. PLN (Persero) Jakarta August'16 - September '16 Sub-Consultant
55 Jasa Manajemen Konstruksi Pembangunan Sub Gardu Induk Bandara Soekarno-Hatta dan Penarikan Kabel Power Menuju Gardu Hubung Bandara Soekarno-Hatta PT. Angkasa Pura II Bandara Soekarno-Hatta Februari’16-September 2018 (on going) Sub-Consultant
56 Peningkatan Kapasitas dan Jaringan Listrik Bandara Soekarno Hatta Tangerang PT. Angkasa Pura II Bandara Soekarno-Hatta Oktober 2014-April 2017 Sub-Consultant
57 Replacement Peralatan Jaringan Listrik Priority dan Non-Priority Kawasan Tengah di Bandara Soekarno-Hatta PT. Angkasa Pura II Bandara Soekarno-Hatta June'16 - August'16 Sub-Consultant
58 Electricity Business Development of PT. PLN Tarakan PT. PLN Tarakan Tarakan Februari’16-April’16 Sub-Consultant
59 Jasa Konsultasi Kajian Lanjutan Penyempurnaan Susut Jaringan Distribusi 2015-2024 PT. PLN (Persero) Seluruh Indonesia Februari’16 – Mei’16 Sub-Consultant
60 Pemutakhiran Road Map Listrik Perdesaan Propinsi Jawa Barat PT. PLN (Persero) Distribusi Jawa Barat Jawa Barat Maret’16-Juni’16 Sub-Consultant
61 Pra Feasibility Studi PLTg Bandara Soetta PT. Angkasa Pura II Bandara Soekarno HattaTangerang March – June 2015 Sub-Consultant
62 Development Planning of Sub Station and Power Cables at Soekarno Hatta International Airport PT. Angkasa Pura II Bandara Soekarno HattaTangerang March – June 2015 Sub-Consultant
63 Feasibility Study of Airport Power Plant at Kualanamu Internasional Airport PT. Angkasa Pura II Bandara Kualanamu Medan September 2014-February 2015 Sub-Consultant
64 Electricity Roadmap Study PT. Angkasa Pura II Pangkal Pinang Airport, Sultan Thaha-Jambi & Supadio-Pontianak Airport July – August 2014 Sub-Consultant
65 Studi Kelayakan Pembangunan Independent Power Producer di Sumatera Utara PT.Pertamina Pusat Sumatera Utara October'14-December'14 Sub-Consultant
66 Electricity System Assessment in 13 Fields PT. Pertamina EP 13 fields in Indonesia November 2013 – January 2016 Sub-Consultant
67 Front End Engineering Design (FEED) Power Plant District I UBEP Lirik PT. Pertamina EP Lirik, Jambi January 2013 – May 2013 Sub-Consultant
68 Karama HEPP 450 MW West Sulawesi PT. PLN (Persero) Pusat West Sulawesi Februarry 2012 Sub-Consultant
69 Dynamic stability studies for Sumatera Electric power interconnection PLN Puslitbang, P3B Sumatera Sumatera March 2011 – October 2011 Sub-Consultant
NO PROJECT'S TITTLE USER LOCATION PERIOD REMARK
1 Studi Analisis Mengenai Dampak Lingkungan (AMDAL) PT Danum Mahasur Energi Makasar January 19 – July 2019 Main Consultant
2 Studi Relay Proteksi Panel TM Bandara Ahmad Yani Semarang PT Duta Listrik Graha Prima Semarang November 2018 – February 2019 Sub-Consultant
3 Studi Pemasangan Shunt Reactor Pembangkit Listrik Tenaga Air (PLTA) Air Putih 3x7 MW di Subsistem Bengkulu PT Bangun Energi Sentosa Bengkulu 2019 Main Consultant
4 Grid Impact Study PLTbg Langgam ke System 20 KV PT Bangun Energi Sentosa Riau 2019 Main Consultant
5 Engineering Work Design for Lighting and Small Power Installation (PLTA BARRU) PT WIJAYA KARYA Sulawesi November ’18 – February ‘19 Main Consultant
6 Pelaksanaan Rencanan Bisnis Energy Center Kertadjati Aerocity Hire Engineering Majalengka May ‘18 Main Consultant
7 Mekanikal,Elektrikal,Elektronika dan Plumbing Terminal Pelabuhan Laut KIJING PT Promisco Sinergi Indonesia Jakarta July ‘18 – December ‘18 Main Consultant
8 Studi Interkonesi PLTA Asahan Iv - Sumatera Utara PT Berkat Bina Karya Sumatera July ’18 – September ‘18 Main Consultant
9 Studi Interkoneksi PLTA PEUSANG 120 MW PT Global Power Indonesia Sumatera May ’18 – July ‘18 Main Consultant
10 Translate Hasil Studi Existing PLTA SALU URO PT. Tirta Energy Cemerlang Sulawesi April ’18 – May ‘18 Main Consultant
11 Translate Hasil Studi Kelistrikan Existing Untuk PLTA Kalaena PT SUMBER RAHMAT PERTIWI Kalaena April ’18 – May ‘18 Main Consultant
12 Studi Kelistrikan dan Setting Relay PT Saka Jagad Pratama Biak-Papua July'18-August'18 Main Consultant
13 Grid Impact Study PLTA Aek Kualu 2x16,5 MW, PLTA Sidikalang #1 3x5.5 MW, PLTA Lau Sireme 3x5 MW PT ASRIPOWER Sumatera Utara May'18-June'18 Main Consultant
14 Studi Interkoneksi Pembangkit Listrik Tenaga Air (PLTA) Pakkat #2 - 2 X 17,5 Mw PT. Bangun Energi Sentosa Sumatera Utara April '18-June'18 Main Consultant
15 Pekerjaan Analisa Perhitungan Pemasangan Autotrafo & Analisa Perhitungan Rencana Pemasangan Kapasitor 20 Kv Untuk Kompensasi Daya Reaktif PLTA Pakkat PT. Energi Sakti Sentosa Sumatera Utara April '18-June'18 Main Consultant
16 Studi Kelayakan Bankable Pembangunan PLTU Refinery Alumina PT. BITA ENARCON ENGINEERING Kalimantan Barat Feb'18-June'18 Main Consultant
17 Studi Interkoneksi Pembangkit Listrik Tenaga Air (PLTA) ISAL 2 3 X 20 MW Di Desa Kaloa, Kecamatan Seram Utara, Pulau Seram Kabupaten Maluku Tengah PT Danum Mahasur Energi Pulau Seram Maluku Tengah Feb'18-Maret'18 Main Consultant
18 Grid Impact Study Pembangkit Listrik Tenaga Photovoltaic 150 MW Lokasi Muara Gembong Di Sistem Jawa-Bali PT Bakrie Power Muara Gembong Bekasi March'17 - July '17 Main Consultant
19 Jasa Training Dan Software Aplikasi Simulasi Monte Carlo PT Prima Layanan Nasional Enjiniring Bandung February '17 Main Consultant
20 Jasa Studi Sistem Kelistrikan Pembangkit Listrik Tenaga Air 3 x 6 MW (PLTA PAKKAT) PT. Energy Sakti Sentosa Kabupaten Humbang Hasundutan Sumatera Utara November'16-January'17 Main Consultant
21 Study Penyambungan PLTS 6 MW di Tarakan Kalimantan Utara PT Tritama Mitra Lestari (TML Energy) Tarakan November'16-Desember'16 Sub-Consultant
22 Inventarisasi Rumah Belum Berlistrik Di Kabupaten Subang PT. Edumatic Internasional Subang September'16-Oktober'16 Sub-Consultant
23 Tahun 2014 - 2015 Wilayah Kabupaten Bekasi Dan Kota Bekasi PT. Edumatic Internasional Bekasi September'16-Oktober'16 Sub-Consultant
24 Interconnection Study of PLTA Aek Nabara PT. Sumber Bahtera Abadi North Sumatera August'16 - October '16 Sub-Consultant
25 Studi Penyambungan PLTS 3 MW di Kalimantan Selatan PT Tritama Mitra Lestari (TML Energy) Kalimantan Selatan Agustus'16-Oktober'16 Sub-Consultant
26 Studi Sistem Kelistrikan Pembangkit Listrik Tenaga Mikrohidro 2 X 5 MW Di Sulawesi Selatan PT Energy Karya Persada Sulawesi Selatan August'16 -October'16 Sub-Consultant
27 Power System Analysis in Panjang Island Power Plant 2 x 1000 MW + 4 x 660 MW Hire Engineering Pulau Panjang June – August 2015 Sub-Consultant
28 Power System Analysis Jawa-13 Steam Power Plant (2x1000 MW) Hire Engineering Gresik June – August 2015 Sub-Consultant
29 GRATI POWER PLANT POWER SYSTEM STUDY 800 MW Hire Engineering Grati, East Java August'15-Sept'15 Sub-Consultant
30 Power System Analysis Muara Gembong Power Plant (2 X 1000 MW) Hire Engineering Muara Gembong Bekasi August'15-November'15 Sub-Consultant
31 POWER SYSTEM ANALYSIS STEAM POWER PLANT PAITON Hire Engineering Paiton, East Java September'15-November'15 Sub-Consultant
32 Electricity System Study Micro Hydro Power Plant 2 X 2,5 MW (PLTM SALU PAKU) PT. Bangun Energi Lestari South Sulawesi August'16 - October'16 Sub-Consultant
33 Electricity System Study of PLTA Salu Uro & Kalaena PT. Tirta Energy Cemerlang Sulawesi March-May 2014 Sub-Consultant