PROJECT LIST

PROJECT'S TITTLE USER LOCATION PERIOD
Preliminary Grid Impact Study 100 MW Solar PV Connected To Khatulistiwa System In West Kalimantan ACWA Power West Kalimantan April' 2020
Connection Point Determination Study Of Renewable Power Plant In Sumba Hydrogene de France Sumba Maret' 2020
Electrical Safety Study And Training For Electrical Safety PT. Reckitt Benckiser Indonesia Bogor April' 2020
Practical Experience and Prospects Of Energy Accesibility In Asean Asean Centre For Energy Jakarta Januari' 2020
Grid Interconnection Study PLTB Sumba Timur PT. Hywind Energy Solution East Sumba Desember' 2019
Preliminary Grid Impact Study Solar PV Farm on Barito System South Kalimantan ACWA Power South Kalimantan Juni' 2020
Grid Impact Study Solar PV Farm Floating In Gajah Mungkur ACWA Power & Energia Prima Nusantara Gajah Mungkur Desember' 2019
Preliminary Grid Impact Study 90MW Solar PV Farm Floating in Singkarak Lake Connected to Sumatra Interconnection System ACWA Power Singkarak November' 2019
Engineering Cost Estimate & General Basic Design for Wind Farm UPC Renewables Jakarta Agustus' 2019
Grid Impact Study Combined Cycle Power Plant (CCGT) Connected to Bali Subsystem PT Poyry Indonesia Bali Mei' 2019
Bali Waste to Energy System Study PT Poyry Indonesia Bali Agustus' 2019
Grid Impact Study of PLTB Ambon Wind Farm UPC Renewables Ambon Juli' 2019
Grid Impact Study of Wind Farm Power Plant In Banyuwangi PT Poyry Indonesia Banyuwangi Juli' 2019
Grid Integration Study of PLTB Sukabumi Wind Farm UPC Renewables Sukabumi Juli' 2019
Grid Impact Study on-Grid Hybrid in Nusa Penida Bali PT Poyry Indonesia Nusa Penida - Bali Agustus' 2019
Preliminary Grid Impact Study Karimunjawa PT Poyry Indonesia Karimunjawa April' 2019
Technical Consultan for Digsilent Training GIZ Office Indonesia Jakarta April' 2019
Preliminary Market Assesment for Batery Energy Storage System Bess In Indonesia PT Poyry Indonesia Jakarta Mei' 2019
Study Sidrap II Wind Farm Power Plant 63 MW UPC Renewables Sidrap Maret' 2019
Pararel Operation Study for PLTU Asahimas Chemical 2X151.5 MW ti PLN Subsystem Cilegon PT Asahimas Chemical Cilegon Jan' 2019
Preliminary Electrical Study of Riau Hybrid REPP PT Poyry Indonesia Riau Dec' 2018
Grid Impact Study Renewable Energy Hybrid Solar Pv North Sulawesi PT Poyry Indonesia Sulawesi Nov' 2018
Grid Impact Study of Sancang Garut Wind Farm 150 MW EGERES INVESMENT Pte.Ltd Garut – Jabar Nov’18-Jan’19
Preliminary Feasibility Study Solar Farmin Lampung EDF Energy Lampung Nov'18-Dec'18
Grid Impact Study for A Wind Power Plant (80 MW) in Aceh – Indonesia PT. Aceh Energi Eoliana-AKUO ENERGY Aceh Nov'18-Feb'19
Grid Impact Study NT (60 MW) in Majene – Indonesia PT. Majene Energi Bayu-AKUO ENERGY Majene Nov'18-Feb'19
Preliminary Electrical Study of Riau Hybrid REPP (Solar PV and Diesel Engine) PT. POYRY Indonesia Riau Nov'18-Dec'18
Grid Impact Study for Combined Cycle Power Plant in Sumatra Tractebel Engineering Jambi August'18-September'18
Preliminary Grid Study Lawelawe -LSS Sugar Group Engie Asia Pasific Co. Ltd Lawe-lawe Kaltim Maret'18-April'18
Grid Impact Studies for Indonesia Archipelago Hybrid Solutiong (AHS) Project Infunde Development PTE. Ltd Papua,Nias,sumba,etc March'18 - December'18
PRELIMINARY GRID IMPACT STUDY Solar Farm PV on Mahakam System, East Kalimantan Engie Services Indonesia East Kalimantan February'18 - March'18
Review on Grid Impact Study of Hybrid Power Plant Infunde Development PTE. Ltd Nusa Tenggara Barat January'18 - March'18
Power System Consulting Study for 2 x 100 MW Kaltim 3 & Kaltim 6 Coal Fired Power Plant in East Kalimantan PT. POYRY Indonesia Jakarta November '17- January 2018
Grid Study PLTBG Laman Satong AANE KAL Austindo Aufwind New Energy West Kalimantan January'17 - March'17
PROJECT'S TITTLE USER LOCATION PERIOD
Pekerjaan Jasa Konsultan Preliminary Grid Interconnection Study PLTA Bakaru 3 PT. Indonesia Power Bandung Apr ’20 – May ‘20
Joint Full Grid Impact Study untuk Proyek Energi Baru dan Terbarukan PLTS Lampung (Peaker) dan PLTS Terapung Danau Singkarak PT. Indonesia Power Lampung – Singkarak Jan ’20 – Mar ‘20
Pengadaan Pekerjaan Pembuatan Aplikasi Mjd Mobile PT PLN (Persero) Unit Induk Jakarta Raya Jakarta Apr ’19 – May ‘19
Jasa Konsultan Perencanaan Tarif Layanan Blud Pemegang Kas Dinas Pemkot Bandung Bandung Aug ’19 – Sep ‘19
Network Area Storage (NAS) Dan Konfigurasi PT PLN (Persero) Unit Induk Jakarta Raya Jakarta Feb ’19 – Mar ‘19
Mapping JTR, Pelanggan serta Pemeliharaan JTM dan Gardu 2019 - Entri dan Drafting Pada Aplikasi GIS UP3 Banten Selatan PT PLN (Persero) UID Banten UP3 Banten Selatan Banten Mar ’19 – Dec ‘19
Belanja Jasa Konsultan Perencana Pemeliharaan Jaringan Listrik Gedung Kantor Dan Rumdin Dinas Walikota Bandung Bandung Nov ’18 – Dec ‘18
Pembuatan Aplikasi Progres SPK SKTM Berbasis Android PT. PLN (Persero) Area Jakarta Raya Jakarta -
Rekonfigurasi Jaringan SCADA Untuk Kehandalan Jaringan RTU GI dan GH PT. PLN (Persero) Area Kalselteng Kalimantan November ’18 – December ‘18
Jasa Pengembangan Aplikasi Pendukung Operasi Realtime UP2D Kalsel Dan Kalteng PT. PLN (Persero) Area Kalselteng Kalimantan November ’18 – January ‘19
Pengembangan Fitur Aplikasi Mapping PT. PLN (Persero) AREA KEBON JERUK Jakarta December ’18 – January ‘19
Pengoperasian Dan Pemeliharaan Instalasi Listrik Jaringan Visual Aid, UPS / Rectifier Dan Penerangan di BSH PT. Angkasa Pura Solusi Tangerang September ’18 – August ‘19
Belanja jasa konsultasi perencanaan (Evaluasi Kinerja pd. Kebersihan Kota Bandung) Pemkot Bandung Kota Bandung July ’18 – August ‘18
Supervisi Instalasi Dan Testing Commisining Pemasangan UPS, Genset & Lighting Terminal 3 Bandara Soekarno - Hatta Dan Pemasangan Pannel Bandung PT. Angkasa Pura Solusi Tangerang September ’18 – February ‘19
Pengadaan Dan Pemasangan Server Historical Dan Server Portal Aplikasi Apd Integrasi Dengan Server Scada PT PLN (PERSERO) Wilayah Kalselteng Kalselteng May'17-August'17
Jasa Engineering (Engineering Design) Pada Proyek Replacement Peralatan Jaringan Listrik Priority dan Non-Priority Kawasan Tengah Di Bandara Soekarno-Hatta PT NINDYA KARYA (Persero) Bandara Soekarno Hatta Tangerang February'17-Februari'18
PROJECT'S TITTLE USER LOCATION PERIOD
Review dan Penulisan Ulang Feasibility Study PLTA ISAL #2 (3x20 MW) di Seram Utara, Kabupaten Maluku Tengah Provinsi Maluku PT Danum Mahasur Energi Seram, Maluku Tengah Oct 2019 – Nov 2019
Studi Interkoneksi Pembangkit Listrik Tenaga Minihidro (PLTM) Madong (Kap. 2 x 5 MW) PT Nagata Dinamika Hidro Madong Jakarta Aug 2019 – Oct 2019
Jasa Pembuatan SLD dan Database PT Arlisco Anugrah Pratam Tanggerang Jul 2019 – Nov 2019
Pemutakhiran Grid Impact Study PLTA ISAL #2 (3 x 20) Di Seram Utara, Kabupaten Maluku Tengah, Provinsi Maluku PT Danum Mahasur Energi Seram, Maluku Tengah Aug 2019 – Sep 2019
Studi Analisis Mengenai Dampak Lingkungan (AMDAL) PT Danum Mahasur Energi Makasar January 19 – July 2019
Studi Relay Proteksi Panel TM Bandara Ahmad Yani Semarang PT Duta Listrik Graha Prima Semarang November 2018 – February 2019
Studi Pemasangan Shunt Reactor Pembangkit Listrik Tenaga Air (PLTA) Air Putih 3x7 MW di Subsistem Bengkulu PT Bangun Energi Sentosa Bengkulu 2019
Grid Impact Study PLTbg Langgam ke System 20 KV PT Bangun Energi Sentosa Riau 2019
Engineering Work Design for Lighting and Small Power Installation (PLTA BARRU) PT WIJAYA KARYA Sulawesi November ’18 – February ‘19
Pelaksanaan Rencanan Bisnis Energy Center Kertadjati Aerocity Hire Engineering Majalengka May ‘18
Mekanikal,Elektrikal,Elektronika dan Plumbing Terminal Pelabuhan Laut KIJING PT Promisco Sinergi Indonesia Jakarta July ‘18 – December ‘18
Studi Interkonesi PLTA Asahan Iv - Sumatera Utara PT Berkat Bina Karya Sumatera July ’18 – September ‘18
Studi Interkoneksi PLTA PEUSANG 120 MW PT Global Power Indonesia Sumatera May ’18 – July ‘18
Translate Hasil Studi Existing PLTA SALU URO PT. Tirta Energy Cemerlang Sulawesi April ’18 – May ‘18
Translate Hasil Studi Kelistrikan Existing Untuk PLTA Kalaena PT SUMBER RAHMAT PERTIWI Kalaena April ’18 – May ‘18
Studi Kelistrikan dan Setting Relay PT Saka Jagad Pratama Biak-Papua July'18-August'18
Grid Impact Study PLTA Aek Kualu 2x16,5 MW, PLTA Sidikalang #1 3x5.5 MW, PLTA Lau Sireme 3x5 MW PT ASRIPOWER Sumatera Utara May'18-June'18
Studi Interkoneksi Pembangkit Listrik Tenaga Air (PLTA) Pakkat #2 - 2 X 17,5 Mw PT. Bangun Energi Sentosa Sumatera Utara April '18-June'18
Pekerjaan Analisa Perhitungan Pemasangan Autotrafo & Analisa Perhitungan Rencana Pemasangan Kapasitor 20 Kv Untuk Kompensasi Daya Reaktif PLTA Pakkat PT. Energi Sakti Sentosa Sumatera Utara April '18-June'18
Studi Kelayakan Bankable Pembangunan PLTU Refinery Alumina PT. BITA ENARCON ENGINEERING Kalimantan Barat Feb'18-June'18
Studi Interkoneksi Pembangkit Listrik Tenaga Air (PLTA) ISAL 2 3 X 20 MW Di Desa Kaloa, Kecamatan Seram Utara, Pulau Seram Kabupaten Maluku Tengah PT Danum Mahasur Energi Pulau Seram Maluku Tengah Feb'18-Maret'18
Grid Impact Study Pembangkit Listrik Tenaga Photovoltaic 150 MW Lokasi Muara Gembong Di Sistem Jawa-Bali PT Bakrie Power Muara Gembong Bekasi March'17 - July '17
Jasa Training Dan Software Aplikasi Simulasi Monte Carlo PT Prima Layanan Nasional Enjiniring Bandung February '17
Jasa Studi Sistem Kelistrikan Pembangkit Listrik Tenaga Air 3 x 6 MW (PLTA PAKKAT) PT. Energy Sakti Sentosa Kabupaten Humbang Hasundutan Sumatera Utara November'16-January'17