Pekerjaan Pengadaan Dan Pemasangan Stop Bar Light Runway 07L-25R Di Bandara Internasional Soekarno – Hatta |
December 2023 – December 2024 |
Main Consultant |
Pekerjaan Kajian Operasional Pabrik & Pembangkit Listrik Feni Hamahera Timur |
December 2023 – February 2024 |
Quadran Personnel’s Experience |
Jasa Kajian Power Quality Terhadap Operasional Pelanggan KTT Di Wilayah PLN UIT JBT |
December 2023 – March 2024 |
Quadran Personnel’s Experience |
Pekerjaan Jasa Konsultan Assesment Ssitem Dan Fasilitas Kelistrikan Bandara Soekarno – Hatta |
November 2023 – Januari 2024 |
Quadran Personnel’s Experience |
Pengadaan Pekerjaan Kajian Sistem Tenaga Rencana Pembangunan SKTET 500 KV Di Sistem Jawa Madura Dan Bali |
November 2023 – Februari 2024 |
Quadran Personnel’s Experience |
Pengadaan Jasa Konsultansi Penyusunan Evaluasi Dan Kajian Teknis Perubahan Pondasi Borepile Diameter 40 CM Menjadi Diameter 60 CM Pekerjaan Pembangunan Transmisi 150 KV KID – Pakning |
November 2023 – Januari 2024 |
Quadran Personnel’s Experience |
Jasa Borongan Pengembangan Moduk Perencanaan Gardu Induk Transmisi |
November 2023 – Februari 2024 |
Main Consultant |
Asesmen Sistem Jaringan Distribusi Listrik Dan Koordinasi Relay Proteksi Eksisting Di Bandar Udara Sultan Hasanuddin Makassar |
November – December 2023 |
Quadran Personnel’s Experience |
Jasa Konsultan Grid Study Untuk Ekspansi Proyek Jawa Satu Power |
October – December 2023 |
Main Consultant |
Pengadaan Pekerjaan Jasa Konsultansi Grid Impact Study Pembangkit Listrik Tenaga Surya (PLTS) 100 MW PT Aruna Cahaya Pratama |
November 2023 – Januari 2024 |
Main Consultant |
Jasa Pemborongan Pekerjaan Power System Assesment Study Of PLN Grid Transmission System In Bontang Kaltim As Power To PT Badak NGL |
October 2023 – January 2024 |
Quadran Personnel’s Experience |
Jasa Konsultansi Review dan Update HPE Pembangkit PLTS Tembesi Kapasitas 35 MWAC |
October – November 2023 |
Quadran Personnel’s Experience |
Jasa Konsultansi Study Workability Pekerjaan SUTET 500KV Unggaran-Pedan Dan Peletakan KWH Meter Di PLTU Batang |
October – December 2023 |
Quadran Personnel’s Experience |
Pekerjaan Kajian Teknis Dan Simulasi Load Flow PLTA Cirata Sebagai Dampak Beroperasinya PLTS Terapung Pada Sistem 150 KV dan 500 KV |
October – November 2023 |
Quadran Personnel’s Experience |
Pekerjaan Jasa Konsultan Grid Impact Dan Preliminary Optimum Capacity Analysis PLTS Terapung VOID Kalimantan |
September – November 2023 |
Main Consultant |
Studi Kesiapan Sistem Tenaga Listrik Terhadap Penetrasi PLTS Di Sistem Sumatera |
September – December 2023 |
Quadran Personnel’s Experience |
Jasa Penyusunan Rencana Pengembangan System Pembangkit Dan Transmisi Batam 2024-2033 |
September – December 2023 |
Quadran Personnel’s Experience |
Jasa Konsultansi Studi ADS Subsistem Kesugihan – PLTU Cilacap, dan Subsistem Balaraja 3,4 – PLTU Lontar |
August – November 2023 |
Quadran Personnel’s Experience |
Jasa Konsultansi Studi Kelayakan Model Bisnis Joint Venture Company (JVC) PT PLN Batam Dengan Mitra Untuk Pasokan Dan Pengelolaan Sistem Kelistrikan Di KEK Nongsa Digital Park |
August – September 2023 |
Quadran Personnel’s Experience |
Kajian Kehandalan Sistem Batam – Bintan 2023 |
August – November 2023 |
Quadran Personnel’s Experience |
Pengadaan Project Engineering Consultant EPC Kompensator Dan Gardu Induk Antam Pomala |
August 2023 – January 2024 |
Quadran Personnel’s Experience |
Kajian Fuel Mix Dan Bauran Energi Baru Terbarukan (EBT) DI Indonesia Mempertimbangkan Kondisi Realistis Jangka Waktu 2023 – 2027 |
July – September 2023 |
Quadran Personnel’s Experience |
Jasa Konsultan Basic Engineering Design PLTS Terapung Tembesi 30 MW |
July – August 2023 |
Main Consultant |
Jasa Konsultan Asesmen Peningkatan Kehandalan Kinerja Sistem Kelistrikan Di Bandar Udara Internasional Yogyakarta Kulon Progo |
July – September 2023 |
Quadran Personnel’s Experience |
Jasa Studi Dan Konsultansi Tunning PSS Pembangkit Sistem Sulawesi Bagian Selatan |
July 2023 – January 2024 |
Quadran Personnel’s Experience |
Pekerjaan Jasa Konsultan Valuasi Produktivitas Asset Transmisi Dan Distribusi Di PLN (Persero) |
July – December 2023 |
Quadran Personnel’s Experience |
Pengadaan Jasa Konsultansi Studi Kesiapan Sistem Tenaga Listrik Terhadap Penetrasi PLTS DI Sistem Jawa, Madura dan Bali (Jamali) |
July – October 2023 |
Quadran Personnel’s Experience |
Pekerjaan Jasa Konsultansi Studi Kemampuan Sistem Tenaga Listrik Terhadap Penetrasi PLTS Pada Sistem Sulawesi |
May – August 2023 |
Quadran Personnel’s Experience |
Jasa Studi Peningkatan Kehandalan Sistem Kelistrikan Petamina Hulu Rokan |
June – August 2023 |
Main Consultant |
Workshop Pemodelan Dan Simulasi Sistem Tenaga Listrik Dengan Digsilent Power Factory |
June 2023 |
Quadran Peronnel’s Experience |
Training Variable Renewable Energy (VRE) Impact Methodology |
June 2023 |
Quadran Personnel’s Experience |
Pelatihan Filosofi Desain pada Proyek Revitalisasi Sistem Kelistrikan Istana Negara |
June 2023 |
Main Consultant |
Pelaksanaan Jasa Kosnultansi Optimalisasi Perhitungan Susut Transimis Di Sistem Kalimantan |
June – August 2023 |
Quadran Personnel’s Experience |
Jasa Konsultan Kesiapan Sistem Tenaga Listrik Terhadap Penetrasi PLTS Di Sistem Kalimantan |
June – July 2023 |
Quadran Personnel’s Experience |
Jasa Tunning Power System Stabilizer (PSS) AVR Unit 1, 3 Dan 4 Saguling |
February – October 2023 |
Quadran Personnel’s Experience |
Pekerjaan Kasa Konsultan Assessment Sistem Tata Udara Terminal 3 Bandara Internasional Soekarno – Hatta |
June – September 2023 |
Quadran Personnel’s Experience |
Pekerjaan Penambahan Panel MVMDP, Trafo Dan LVMDP Subgardu SS7 Terminal 3 Dan Peningkatan Landscape Ke PS1 Di Bandara Soekarno Hatta |
June – July 2023 |
Quadran Personnel’s Experience |
Pekerjaan Replacement Peralatan Jaringan Listrik Non Priority Dan Technical Di Bandara Soekarno – Hatta (Jasa Konsultan Perencana) |
June – July 2023 |
Quadran Personnel’s Experience |
Jasa Konsultansi Kajian Kelayakan GI Nagoya |
May – August 2023 |
Quadran Personnel’s Experience |
Kajian Finansial Pembangkit Baru, Transmisi dan Gardu Induk Baru, Teknologi Baru dan Penurunan Emisi Karbon – Paket 3 |
February – May 2023 |
Main Consultant |
Kajian Penambahan Transmisi, Gardu Induk dan Teknologi Baru – Paket 2 |
February – May 2023 |
Main Consultant |
Kajian Simulasi dan Analisa Sistem Pembangkitan Dan Simulasi Sistem Tenaga Listrik – Paket 1 |
February – April 2023 |
Quadran Personnel’s Experiense |
Pekerjaan Jasa Konsultan Preliminary Grid Impact Study Untuk Proyek PLTGU Hybrid, PLTS dan PLTB Di Cirebon |
February – March 2023 |
Main Consultant |
Penyusunan Stabilitas Sistem dan Assessment Generator Pembangunan PLTU Palu 3 (2 x 50 MW) |
November 2022 – February 2023 |
Main Consultant |
Jasa Konsultansi Analisa Permasalahan Generator 1 |
October – December 2022 |
Quadran Personnel’s Experience |
Pekerjaan Jasa Pengembangan Aplikasi Manajemen Operasi dan Pemeliharaan Jawa Barat (Manohara Jabar) |
December 2022 – June 2023 |
Main Consultant |
Jasa Konsultan Assessment Kelistrikan Tenant Kawasan Terminal 1, Terminal 2, Terminal 3 dan Non-Terminal Bandara Soekarno-Hatta |
January – March 2023 |
Quadran Personnel's Experience |
Jasa Konsultan Manajemen Konstruksi Pengadaan Dan Pemasangan Panel Backup Incoming MVMDL |
December 2022 – June 2023 |
Quadran Personnel's Experience |
Pekerjaan Jasa Konsultansi Assesment Gardu P14 |
September – October 2022 |
Main Consultant |
Pekerjaan Jasa Konsultansi Studi Stabilitas Sistem Kalimantan |
October 2022 – March 2023 |
Quadran Personnel's Experience |
Pekerjaan Pendampingan Tender Kompensator Untuk Smelter Di PT Antam Halmahera Timur |
October – December 2022 |
Quadran Personnel's Experience |
Kajian Evaluasi Skema Energize SUTET – GITET 500 KV NEW Aurduri – Peranap – Perawang |
September – November 2022 |
Quadran Personnel's Experience |
Workshop Aplikasi Digsilent Untuk Proteksi Transmisi Dan Gardu Induk PT PLN (Persero) UIKL Sulawesi |
October - November 2022 |
Quadran Personnel's Experience |
Workshop Power Failure Investigation Pada Sistem Tenaga Listrik |
October - November 2022 |
Quadran Personnel's Experience |
Jasa Konsultan Preliminary Grid Impact Study - Bali |
November 2022 - November 2023 |
Main Consultant |
Jasa Studi Pengembangan Pasokan Listrik dan Steam ke PT Pertamina Hulu Rokan (PHR) Jangka Panjang |
October 2022 - January 2023 |
Main Consultant |
Kajian Engineering Remaining Life Assesment Fasilitas EP Unit 1-7 |
September - November 2022 |
Main Consultant |
Pengadaan Jasa Konsultansi Perkuatan Sistem Kelistrikan Madura |
Oktober 2022 - January 2023 |
Quadran Personnel's Experience |
Pekerjaan Jasa Konsultansi Studi Stabilitas Sistem Sulawesi Bagian Tengah |
Oktober 2022 - January 2023 |
Quadran Personnel's Experience |
Jasa Konsultansi Tunning PSS Pembangkit Sistem Jawa Bali 2022 |
September 2022 – March 2023 |
Quadran Personnel’s Experience |
Kajian Evaluasi Skema Energize SUTET – GITET 500 KV New Aurduri – Peranap – Perawang |
September – November 2022 |
Quadran Personnel’s Experience |
Penyusunan Kajian Pola Kerja Maintenance Kantor Cabang PT Angkasa Pura II |
August – November 2022 |
Quadran Personnel’s Experience |
Pekerjaan Jasa Konsultan Kajian Enjiniring Dan Konstruksi SUTET dan GITET 275 KV Sulawesi |
June – August 2022 |
Quadran Personnel’s Experience |
Penyusunan Roadmap Stasiun Pengisian Kendaraan Listrik Umum (SPKLU) dan Kendaraan Bermotor Listrik Berbasis Baterai (KBLBB) PT Angkasa Pura II |
July – September 2022 |
Quadran Personnel’s Experience |
Jasa Konsultan Grid Impact Study Proyek Pembangkit Listrik Tenaga Surya (PLTS) PT Pertamina Hulu Rokan – Tahap 2 |
May – July 2022 |
Main Consultant |
Jasa Konsultansi Studi ADS SS Cibatu - Indramayu - Mandirancang - CEP dan ADS Island Gresik Sistem Jawa Bali 2022 |
April - July 2022 |
Quadran Personnel's Experience |
Pekerjaan Studi Skenario Optimal Pasokan Listrik dan UAP ke PHR Beserta Basic Desain Infrastruktur dan Kebutuhan Investasinya |
April – July 2022 |
Quadran Personnel's Experience |
Pekerjaan Re-Desain Gardu –Gardu P12, P14, dan P25 Di Lingkungan Kompleks Istana Negara Jakarta |
April – July 2022 |
Main Consultant |
Pekerjaan Penyesuaian Desain Bangunan Dan Lingkungan Di Sekitar Underground Power House Istana |
April – July 2022 |
Main Consultant |
Pekerjaan Desain Tata Hijau Pohon Pengganti Di Lingkungan Istana |
May – July 2022 |
Main Consultant |
Jasa Konsultan Power Wheeling Proyek Ekspor Listrik Ke Singapura |
February – May 2022 |
Quadran Personnel's Experience |
Pekerjaan Jasa Konsultansi Update Preliminary Grid Impact Study Untuk Proyek PLTB - Jawa Timur |
Febryary – April 2022 |
Main Consultant |
Studi Sistem Jawa Bali 2022 Paket 1 Studi Analisa Operasi Subsistem Cibatu #3,4- Mandirancan# 1,2 Dan Operasi Bandung Selatan Incomer |
April 2022 – June 2022 |
Quadran Personnel's Experience |
Pekerjaan Jasa Konsultansi Studi Stabilitas Sistem Sulawesi Dalam Rangka Aktivasi Auto Reclose |
March 2022 – June 2022 |
Quadran Personnel's Experience |
Jasa Konsultan Kajian Kelayakan Rencana Pemasangan Battery Energy System Storage (BESS) Sebagai Fasilitas Black Start di PLTGU Cilegon |
February – April 2022 |
Quadran Personnel's Experience |
Jasa Konsultan Grid Impact Study Proyek Pembangkit Listrik Tenaga Surya (PLTS) Di PT Badak NGL |
January – March 2022 |
Quadran Personnel's Experience |
Jasa Konsultan Grid Impact Study Proyek Pembangkit Listrik Tenaga Surya (PLTS) di Wilayah Kerja PT Pertamina Hulu Rokan |
January – March 2022 |
Quadran Personnel's Experience |
Jasa Konsultan Perancang Data Center 1 Lama Komplek Perkantoran Bank Indonesia (KOPERBI) Jakarta |
January 2022 – February 2023 |
Main Consultant |
Pengadaan Jasa Konsultansi Penyusunan Kajian Roadmap Susut – PT PLN (Persero) |
December 2021 – March 2022 |
Quadran Personnel's Experience |
Pekerjaan Jasa Konsultsan Perencana Penyempurnaan IBMS Terminal 3 Bandara Soekarno-Hatta |
December 2021 – February 2022 |
Quadran Personnel's Experience |
Pekerjaan Jasa Konsultansi Studi Stabilitas Sistem Sulawesi Utara dan Gorontalo |
December 2021 – Maret 2021 |
Quadran Personnel's Experience |
Jasa Konsultan Perancang Visitor Management System (VMS) dan Tracking System (RFID) |
Desember 2021 – March 2022 |
Main Consultant |
Pekerjaan Jasa Kondultansi Kajian Dampak Penetrasi PLTS Atap Pada Sistem Distribusi PT PLN Unit Induk Distribusi Jawa Barat |
November 2021 – February 2022 |
Quadran Personnel's Experience |
Studi Antisipasi Kenaikan Arus Hubung Singkat Sistem Kelistrikan Jawa Madura Bali |
December 2021 – March 2022 |
Quadran Personnel's Experience |
Pekerjaan Jasa Konsultansi Kajian Dampak Interkoneksi KCJB |
December 2021 - March 2022 |
Quadran Personnel's Experience |
Jasa Konsultasi Pengkajian Pola Operasi PLTA Cirata Terhadap Sistem 500 KV Jamali |
October 2021 – December 2021 |
Quadran Personnel's Experience |
Pengadaan Penelitian Studi Kualitas Daya Listrik Lokasi PT. GAS Industri di Kawasan Industri Dumai |
October 2021 – December 2021 |
Quadran Personnel's Experience |
Jasa Konsultasi Studi Pengembangan Sistem Kelistrikan Ambon |
December 2021 – May 2022 |
Quadran Personnel's Experience |
Training Studi Pengembangan Sistem Kelistrikan Ambon |
November 2021 – Januari 2022 |
Quadran Personnel's Experience |
Pengadaan Jasa Konsultansi Studi Dampak Beban Smelter Pada Sistem Tenaga Listrik Sulawesi |
October 2021 – February 2022 |
Quadran Personnel's Experience |
Pekerjaan Jasa Konsultansi Penyusunan Rencana Pengembangan System Pembangkit Dan Transmisi BATAM 2022 – 2031 |
October 2021 – January 2022 |
Quadran Personnel's Experience |
Jasa Konsultansi Antisipasi Kenaikan Arus Hubung Singkat Sistem Kelistrikan Jawa-Madura-Bali |
October 2021 – April 2022 |
Quadran Personnel's Experience |
Konsultan Strategis dan Nuklir terkait Pelaksanaan Pekerjaan Revisi Kajian Bersama Jasa Konsultansi Penambahan Anper INUKI Ke dalam Holding BUMN Farmasi |
October 2021 – December 2021 |
Main Consultant |
Jasa Perbaikan Respon Frekuensi Sistem Jawa, Madura dan Bali saat Gangguan |
October – December 2021 |
Main Consultant |
Diklat in House Training (IHT) Perencanaan dan Operasi Sistem Tenaga |
October – November 2021 |
Main Consultant |
Training Grid Impact Study for Intermitten and Non Dispatchable Renewable Energy Power Plant |
August – September 2021 |
Main Consultant |
Jasa Konsultan Engineering Proyek PLTS dan Smart Grid |
August 2021 – September 2022 |
Main Consultant |
Pelatihan Proteksi Digsilent Proteksi dan Efisiensi Susut |
July 2021 – October 2021 |
Quadran Personnel's Experience |
Jasa Kajian Pemodelan CF Pembangkit PT. PJB Di Sistem Jawa Bali dan Potensi Pengembangannya |
August 2021 - February 2022 |
Quadran Personnel's Experience |
Penugasan Evaluasi Pengujian Gangguan Kubikel |
May 2021 - August 2021 |
Quadran Personnel's Experience |
Studi Analisa Gangguan dan Power Swing di Subsistem Priok |
June 2021 - August 2021 |
Quadran Personnel's Experience |
Pengadaan dan Pemasangan ADS Subsistem Di Jawa Bali Tahun 2021 Paket 3 : Jasa Konsultansi Studi ADS SS Grati - Paiton - Sutami dan SS Bali, Bekasi 2,4 - Cawang 1 - Priok |
May 2021 - August 2021 |
Quadran Personnel's Experience |
Jasa Konsultansi Pemanfaatan Energi Baru Terbarukan Untuk Memperkuat Sistem Kelistrikan Batam |
April 2021 - July 2021 |
Quadran Personnel's Experience |
Jasa Konsultan Perencana Pekerjaan Peningkatan Kapasitas Jaringan Listrik Gardu Hubung dan SST8 Di Bandara Soekarno - Hatta |
April 2021 - June 2021 |
Quadran Personnel's Experience |
Pekerjaan Perkuatan Pasokan Listrik Untuk Kehandalan Istana Negara |
March 2021 - June 2021 |
Quadran Personnel's Experience |
Pengadaan dan Pemasangan Proteksi Adaptive Defence Scheme Sistem Jawa Bali Paket 3, Jasa Pendampingan Adaptive Defence Scheme |
September 2020 - July 2022 |
Quadran Personnel's Experience |
Jasa Konsultan Pengawas Pekerjaan Penggantian Peralatan Mekanikal Elektrikal Di Gedung Tipikal KOPERBI |
March 2021 - February 2021 |
Quadran Personnel's Experience |
Jasa Konsultansi Pengembangan Bisnis di Luar Pelabuhan |
December 2020 - January 2021 |
Quadran Personnel's Experience |
Pengembangan Aplikasi Perencanaan Anggaran PT PLN KalselKalteng |
June 2021 – January 2022 |
Main Consultant |
Jasa Konsultan Update Preliminary Grid Impact Study Untuk PLT Hybrid-Bali |
March – May 2021 |
Main Consultant |
Jasa Konsultan Perancang Dalam Rangka Penggantian Peralatan Electronic Security System Kantor Perwakilan Bank Indonesia Provinsi Lampung, Solo, Kediri, dan Sulawesi Barat |
December 2020 – March 2021 |
Main Consultant |
Konsultan Appraisal Teknis Penjaminan Non-KPBU Program Pengembangan Jaringan Distribusi Listrik Kalimantan, Maluku & Papua |
October 2020 – December 2020 |
Quadran Personnel's Experience |
Pekerjaan Jasa Konsultansi Studi Optimasi Sistem Tenaga Listrik di Indonesia |
October 2020 – June 2021 |
Quadran Personnel's Experience |
Update Preliminary GIS Kalimantan |
August – September 2020 |
Main Consultant |
Pekerjaan Jasa Konsultan Preliminary Grid Interconnection Study PLTA di Kab. Lahat Sumsel |
July – August 2020 |
Main Consultant |
Pekerjaan Jasa Kajian Perkuatan Pasokan Listrik Istana Negara |
July – September 2020 |
Quadran Personnel's Experience |
Kajian Teknis Investigasi Tower Roboh T.67 SUTT 150 KV PLTU Rembang – Rembang – Pati dan Kajian Penanggulangan Tower T.55, T.57, T.63, T.68 SUTT 150 KV PLTU Rembang – Rembang – Pati Serta Tower T.02 SUTT 150KV Rembang – Blora |
June – Oktober 2020 |
Quadran Personnel's Experience |
Pekerjaan Jasa Konsultansi Penyusunan Daftar Penyedia Terseleksi (DPT) Komponen Utama KWH Meter 3-Phase Pascabayar |
June 2020 – February 2021 |
Quadran Personnel's Experience |
Pekerjaan Jasa Konsultan Preliminary Grid Interconnection Study PLTA di Kab Pinrang |
April 2020 – May 2020 |
Main Consultant |
Jasa Konsultansi dan Audit Operasi dan Biaya Terkait Status IPP Terkendala (PLTU IPP Kupang – PT. SMSE) |
March 2020 – May 2020 |
Quadran Personnel's Experience |
Studi Sistem Kalimantan Terkait Storage System, Governor Free, LFC, Automatic Control, dan Pembangkit Fast Response Akibat Penetrasi Pembangkit Intermittent |
January 2020 – August 2020 |
Quadran Personnel's Experience |
Studi Sistem Sulawesi Terkait Storage System, Governor Free, LFC, Automatic Control, dan Pembangkit Fast Response Akibat Penetrasi Pembangkit Intermittent |
January 2020 – August 2020 |
Quadran Personnel's Experience |
Joint Full Grid Impact Study untuk Proyek Energi Baru dan Terbarukan PLTS Lampung dan PLTS Singkarak |
January 2020 – March 2020 |
Main Consultant |
Jasa Konsultansi Studi Stabilitas Sistem Sulawesi |
December 2019 – March 2020 |
Quadran Personnel's Experience |
Studi Desain Enjiniring 500kV Sulawesi |
October 2019 – July 2020 |
Quadran Personnel's Experience |
Jasa Konsultansi Pengujian Dinamik 2019 |
November 2019 – Mei 2020 |
Quadran Personnel's Experience |
Studi Sistem Jawa Bali Tahun 2019 |
November 2019 – Januari 2020 |
Quadran Personnel's Experience |
Studi Tunning PSS Pembangkit Jawa Bali |
October 2019 – March 2020 |
Quadran Personnel's Experience |
Jasa Perencanaan Modifikasi Sistem Power Supply Busbar Common 01MBA PLTG Blok 3 |
September – November 2019 |
Quadran Personnel's Experience |
Assesment Cooling Water Heat Exchanger GT dan Fin Fan Lube Oil Cooler Blok 3-4 |
August – October 2019 |
Quadran Personnel's Experience |
Pengawas Pekerjaan Pengadaan dan Pemasangan VDGS Terminal Bandara Soekarno Hatta Tahap II |
May 2019 – May 2020 |
Quadran Personnel's Experience |
Pengadaan Jasa Pekerjaan Penyusunan Pra Feasibility Study Battery Energy Storage System (BESS) di Provinsi Bali |
April 2019 – June 2019 |
Quadran Personnel's Experience |
Pengadaan Pekerjaan Pembuatan Aplikasi Mjd Mobile |
April 2019 - May 2019 |
Main Consultant |
Network Area Storage (NAS) dan Konfigurasi |
February 2019 - March 2019 |
Main Consultant |
Mapping JTR, Pelanggan serta Pemeliharaan JTM dan Gardu 2019 - Entri dan Drafting Pada Aplikasi GIS UP3 Banten Selatan |
March 2019 - December 2019 |
Main Consultant |
Konsultasi Teknis Pembangkit Listrik Tenaga Surya (PLTS) |
March 2019 - May 2019 |
Quadran Personnel's Experience |
Penyusunan Standarisasi & Kebijakan Fasilitas Tegangan Tinggi di Bandara Soekarno Hatta |
March 2019 - August 2019 |
Quadran Personnel's Experience |
Penyempurnaan Kelistrikan, Mekanikal, dan Elektronika Bandara Tjilik Riwut - Palangkaraya |
March 2019 - 15 April 2019 |
Quadran Personnel's Experience |
Perencanaan Peningkatan Fasilitas Penerangan di Terminal 3 Bandara Soekarno Hatta |
May 2019 |
Quadran Personnel's Experience |
DED Pembangunan Gedung Airport Design Division |
December 2018 - February 2019 |
Quadran Personnel's Experience |
Studi Kelayakan Enjinering Sistem Interkoneksi 500kV HVDC Sumatera - Jawa |
January 2019 – Juli 2019 |
Quadran Personnel's Experience |
Penyusunan Daftar Penyedia Terpilih (DPT) untuk Kompenen Utama Meter Prabayar Fasa Tunggal |
December 2018 – April 2019 |
Quadran Personnel's Experience |
Studi Kualitas Daya Listrik dan Kesiapan Sistem Sulbagsel dan Salutgo |
January 2019 – March 2019 |
Quadran Personnel's Experience |
Pengadaan dan Pemasangan Fiohl untuk Percepatan Manuver di Keypoint |
August 2018 – December 2018 |
Main Consultant |
Jasa Konsultasi Studi dan Uji Dinamis untuk Proteksi Sistem |
February 2019 - March 2019 |
Quadran Personnel's Experience |
Jasa Konsultasi Perencanaan Pekerjaan Revitalisasi Panel Tm 20 KV dan T7 Di Gardu JATSC |
September 2017- November 2018 |
Quadran Personnel's Experience |
Pembuatan Aplikasi Progres SPK SKTM Berbasis Android |
- |
Main Consultant |
Rekonfigurasi Jaringan SCADA untuk Kehandalan Jaringan RTU GI dan GH |
November 2018 – December 2018 |
Main Consultant |
Jasa Pengembangan Aplikasi Pendukung Operasi Realtime UP2D Kalsel dan Kalteng |
November 2018 – January 2019 |
Main Consultant |
Pengembangan Fitur Aplikasi Mapping |
December 2018 – January 2019 |
Main Consultant |
Studi Sistem Jawa Bali Tahun 2018 Studi Mitigasi Gangguan Sutet 500kV Paiton Grati |
November 2018 – March 2019 |
Quadran Personnel's Experience |
Pengoperasian dan Pemeliharaan Instalasi Listrik Jaringan Visual Aid, UPS / Rectifier dan Penerangan di BSH |
September 2018 – August 2019 |
Main Consultant |
Jasa Konsultasi Studi Dynamic Pemodelan Pembangkit Jawa Bali Tahun 2018 |
May 2018 – November 2018 |
Quadran Personnel's Experience |
Studi Sistem Jawa Bali Tahun 2018 Jasa Pendampingan Studi Defence Scheme Jawa Bali |
August 2018 – February 2019 |
Quadran Personnel's Experience |
Jasa Konsutan Perencanaan Pekerjaan Remot Control Monitoring System (RCMS) Terminal 3 Bandara Soekarno Hatta |
August 2018 – September 2019 |
Quadran Personnel's Experience |
Studi Sistem Jawa Bali Tahun 2018 Preliminary Study HVDC Sistem Jawa Bali |
June 2018 – August 2018 |
Quadran Personnel's Experience |
Jasa Konsultan Pengawas Paket Pekerjaan Replacement Peralatan Listrik Substation P50 & Relay Proteksi Line Differential Teknik Utara di Bandara Soekarno Hatta |
September 2018 – June 2019 |
Quadran Personnel's Experience |
Supervisi Instalasi dan Testing Commisining Pemasangan UPS, Genset & Lighting Terminal 3 Bandara Soekarno - Hatta dan Pemasangan Pannel Bandung |
September 2018 – February 2019 |
Quadran Personnel's Experience |
Penguatan Securiy System pada Network SCADA Dan Komunikasi VOIP |
June 2018 – September 2018 |
Main Consultant |
Pembuatan dan Pemasangan Aplikasi Web Portal APD Jateng Dan DIY |
May 2018 – August 2018 |
Main Consultant |
Jasa Konsultasi Revisi Kajian Road Map Susut Jaringan Tahun 2018 - 2020 PLN Kantor Pusat |
May 2018 |
Quadran Personnel's Experience |
Assesment Single Line Diagram |
February 2018 |
Quadran Personnel's Experience |
Pekerjaan DED Pembangunan Gedung Airport Learning Academy Bandara Soekarno Hatta |
January 2018 - May 2018 |
Quadran Personnel's Experience |
Mapping Survey for Medium Voltage Network |
August 2018 – November 2018 |
Main Consultant |
Jasa Konsultansi Alternatif Model Bisnis Kerjasama Penyediaan Kapasitas Tenaga Listrik |
July 2018 – November 2018 |
Quadran Personnel's Experience |
Jasa Konsultansi Kajian Dampak Operasional dan Finansial Masuknya Pembangkit EBT (Intermittent) pada Sistem Tenaga Listrik |
July 2018 – November 2018 |
Quadran Personnel's Experience |
Jasa Konsultan Perencana Pekerjaan Remote Control Monitoring System (RCMS) Terminal 3 di Bandara Soekarno Hatta |
August 2018 - October 2018 |
Quadran Personnel's Experience |
Kegiatan Inventarisasi Rumah Tangga Belum Berlistrik PLN di Wilayah Provinsi Jawa Barat |
May 2018 – September 2018 |
Quadran Personnel's Experience |
Studi Sistem Jawa Bali Tahun 2018 Preliminary Study HVDC Sistem Jawa Bali |
May 2018 – August 2018 |
Quadran Personnel's Experience |
Jasa Konsultan Manajemen Konstruksi Pekerjaan Penambahan Gardu Listrik Bandara Husein Bandung |
January 2018 - August 2018 |
Quadran Personnel's Experience |
Consultation Study of SCADA Transmission & Distribution Timor System |
September 2017 – December 2017 |
Quadran Personnel's Experience |
Jasa Engineering (Engineering Design) pada Proyek Replacement Peralatan Jaringan Listrik Priority dan Non-Priority Kawasan Tengah di Bandara Soekarno-Hatta |
February 2017 – February 2018 |
Quadran Personnel's Experience |
Detail Engineering Desain (DED) Integrated Building – Bandara Soekarno Hatta |
February 2017 - April 2017 |
Quadran Personnel's Experience |
Training for High Voltage Technicians |
October 2017 - September 2017 |
Quadran Personnel's Experience |
Detail Engineering Desain (DED) ME Revitalization Terminal 1 – Bandara Soekarno Hatta |
March 2017 – November 2017 |
Quadran Personnel's Experience |
Measurement of Dynamic Parameters of Generators In Jawa-Bali Power System 2017 |
July 2017 – February 2018 |
Quadran Personnel's Experience |
Assesmen Sistem Jaringan Listrik Bandara Soekarno-Hatta |
December 2016 – February 2017 |
Quadran Personnel's Experience |
Jasa Konsultan Pengawas Paket Pekerjaan Replacement Peralatan Jaringan Listrik Priority dan Non Priority Kawasan Tengah di Bandara Soekarno Hatta |
January 2017 - December 2017 |
Quadran Personnel's Experience |
Mobile Power Plant and Fixed Type Gas Engine Power Plant Package VII |
March 2017 – September 2017 |
Quadran Personnel's Experience |
Studi Sensitivitas Pengembangan Sistem Kelistrikan Jawa-Bali Tahun 2019-2022 |
December 2016 – June 2017 |
Quadran Personnel's Experience |
Reassessment Studies of On Going Sumatera-Java 500kV HVDC Interconnection Project for Reliability & Security of Power Supply in Java & Sumatera |
November 2016 - February 2017 |
Quadran Personnel's Experience |
Engineering Design of 500 KV Sumatera System |
August 2017 – March 2019 |
Quadran Personnel's Experience |
Feasibility Study of Airport Power Plant |
May 2016 – July 2016 |
Quadran Personnel's Experience |
Electricity Network Assessment |
September 2016 – December 2016 |
Quadran Personnel's Experience |
Development Study of Jawa-Bali Grid 2019-2022 |
October 2016 - March 2017 |
Quadran Personnel's Experience |
Planning and Power System Supply Switchgear 6,3kV CNG Plant |
August 2016 - October 2016 |
Quadran Personnel's Experience |
Analisis Dampak Sistem Tenaga di Sumatera Utara atas Proyek IPP KEK Sei Mangkei 250 MW |
June 2016- Juli 2016 |
Quadran Personnel's Experience |
Studi Pelaksanaan Operation and Maintenance Peralatan Elektronika, Elektrikal dan Mekanikal di Terminal 3 Ultimate Bandar Udara Internasional Soekarno-hatta |
February 2016 – April 2016 |
Quadran Personnel's Experience |
Power Wheeling Implementation Study |
August 2016 - September 2016 |
Quadran Personnel's Experience |
Jasa Manajemen Konstruksi Pembangunan Sub Gardu Induk Bandara Soekarno-Hatta dan Penarikan Kabel Power Menuju Gardu Hubung Bandara Soekarno-Hatta |
February 2016 - September 2018 (on going) |
Quadran Personnel's Experience |
Peningkatan Kapasitas dan Jaringan Listrik Bandara Soekarno Hatta Tangerang |
October 2014 - April 2017 |
Quadran Personnel's Experience |
Replacement Peralatan Jaringan Listrik Priority dan Non-Priority Kawasan Tengah di Bandara Soekarno-Hatta |
June 2016 – August 2016 |
Quadran Personnel's Experience |
Electricity Business Development of PT. PLN Tarakan |
February 2016-April 2016 |
Quadran Personnel's Experience |
Jasa Konsultasi Kajian Lanjutan Penyempurnaan Susut Jaringan Distribusi 2015-2024 |
February 2016 – May 2016 |
Quadran Personnel's Experience |
Pemutakhiran Road Map Listrik Perdesaan Propinsi Jawa Barat |
March 2016-June 2016 |
Quadran Personnel's Experience |
Pra Feasibility Studi PLTg Bandara Soetta |
March – June 2015 |
Quadran Personnel's Experience |
Development Planning of Sub Station and Power Cables at Soekarno Hatta International Airport |
March – June 2015 |
Quadran Personnel's Experience |
Feasibility Study of Airport Power Plant at Kualanamu Internasional Airport |
September 2014 - February 2015 |
Quadran Personnel's Experience |
Electricity Roadmap Study |
July – August 2014 |
Quadran Personnel's Experience |
Studi Kelayakan Pembangunan Independent Power Producer di Sumatera Utara |
October 2014 – December 2014 |
Quadran Personnel's Experience |
Electricity System Assessment in 13 Fields |
November 2013 – January 2016 |
Quadran Personnel's Experience |
Front End Engineering Design (FEED) Power Plant District I UBEP Lirik |
January 2013 – May 2013 |
Quadran Personnel's Experience |
Karama HEPP West Sulawesi |
Februarry 2012 |
Quadran Personnel's Experience |
Dynamic stability studies for Sumatera Electric Power Interconnection |
March 2011 – October 2011 |
Quadran Personnel's Experience |